BHEL HARIDWAR SUMMER TRAINING REPORT BLOCK 4 PDF

BHEL Haridwar block 2 heavy fabrication, training report Summer Training Project Report on EMPLOYEE MOTIVATION OF BHEL EMPLOYEES. This project report has been made as a part of the industrial training the least; I would like to thank all the staff members of B.H.E.L. Block-4, Ranipur, Haridwar. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar .. BLOCK-4 CIM (Coil & Insulation Manufacturing) & ACG (Apparatus control Gear) v. .. undertaken summer training in Bharat Heavy Electricals Limited, Haridwar.

Author: Shami Vujin
Country: Bermuda
Language: English (Spanish)
Genre: Health and Food
Published (Last): 11 November 2014
Pages: 368
PDF File Size: 20.4 Mb
ePub File Size: 11.50 Mb
ISBN: 259-9-34855-515-3
Downloads: 42190
Price: Free* [*Free Regsitration Required]
Uploader: Mezitaur

Electrical Machines Block In block 1 turbo simmer and exciter are manufactured. Their prime mover and current is supplied by exciter system.

Steam generator up to MW unit size. Feedback Privacy Policy Feedback. The top strip are provided with axial slots of same cross-section and spacing and used on the rotor winding. Repair of electrical machines. We think you have liked this presentation.

Solar Water Heating Systems v. Jawaharlal Nehru’s vision was bestowed with the onus to make the country self-reliant in manufacturing of heavy electrical equipment. Repair shop for power generating equipment.

  ISO 965-2 PDF

Retaining rings are made u of non-magnetic high strength steeling order to reduce the stray losses. Rotor outside the stator at standstill. Then extra resin is drained out and bars are heated and baked under pressed condition in closed box fixture. Seamless Steel Tubes xiii. Cg — capacitance with respect to ground called ground capacitance.

Spherical butterfly and rotary hxridwar and auxiliaries for hydro station.

D C commutator machines or brushes exciter. The insulating material is applied on job and then the same is impregnated fully dipped in the resin.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR

This collaboration still continues. The voltage is rectified by thyristor circuit to D C. Temperature detector and other device installed or connected within machine, permit the windings core and hydrogen temperature, pressure, and purity in machine.

But the temperature must not be allowed to become too high, otherwise difficulties will be experienced with insulation. The press ring is bolted to the ends of core bars.

Share buttons are a little bit lower. BHEL has indigenously developed the state-of-the-art controlled shunt reactor for reactive power management on long transmission hardiwar. The bars already laid in closed fixture and full fixture is impregnated dipped in resin and then fixture with box is baked under given temperature for given duration.

  ASTM B210 PDF

BHEL REPORT | juhi agarwal –

Today BHEL has 14 Manufacturing Hridwar, 4 Power Sector regional Centers, 8 Service Centers 18 regional offices and large number of Project Sites spread all over India and abroad enables the Company to promptly serve its customers and provide them with suitable products, systems and services efficiently and at competitive prices. The ring screens the flux by short-circuiting. Generator according to requirement 4. To reduce eddy current losses.

Bhel Haridwar- Training report – 800 MW bar CIM block 4 (EEE)

Urban transportation systems iii. Electric Rolling Stock x. Cast Iron CI Foundry 2.

Metering reporrt supervisory equipment. It is also as electromagnet and to give it necessary magnetic strength, the winding must carry a very high current. The company has been earning profits continuously since and paying dividends since The voltage insulation is provided according to the proven resin poor mice base of thermo setting epoxy system. Help Center Find new research papers in: Foster learning, creativity and speed of response.